Abstract
In scheduling environments with deterioration, jobs processed later in the sequence require more time. In this note, we study a scheduling problem in which the processing time of a job is an increasing function of its position in the sequence (rather than its starting time, as assumed in previous studies). We study a flow-time minimization problem on a single machine, with exponential deterioration function. We show that an optimal schedule is V-shaped with respect to job processing times.
Original language | American English |
---|---|
Pages (from-to) | 883-886 |
Number of pages | 4 |
Journal | Mathematical and Computer Modelling |
Volume | 41 |
Issue number | 8-9 |
DOIs | |
State | Published - Apr 2005 |
Keywords
- Deterioration
- Flow-time
- Scheduling
- Single-machine