Abstract
There are many reasons why the average run length has been the operating characteristic of choice to quantify the propensity of a control scheme to give rise to false alarms. Professor Mei's paper dents this consensus. An alternative to Professor Mei's suggested direction is considered.
| Original language | English |
|---|---|
| Pages (from-to) | 389-391 |
| Number of pages | 3 |
| Journal | Sequential Analysis |
| Volume | 27 |
| Issue number | 4 |
| DOIs |
|
| State | Published - Oct 2008 |
Keywords
- Average run length
- Bayesian considerations
- Change-point