Abstract
In this paper, we study the problem of minimizing the maximum late work with the popular option of job rejection on a single machine. We provide two fundamental properties regarding an optimal schedule, prove that the problem is NP-hard, and suggest pseudo-polynomial dynamic programming (DP), establishing that the problem is ordinary NP-hard. We also provide an extensive numerical study. Next, we leverage the provided DP to introduce an algorithm that maps the Pareto-optimal frontier.
| Original language | English |
|---|---|
| Journal | Journal of Scheduling |
| DOIs | |
| State | Accepted/In press - 2026 |
Bibliographical note
Publisher Copyright:© The Author(s), under exclusive licence to Springer Science+Business Media, LLC, part of Springer Nature 2026.
Keywords
- Job rejection
- Maximum late work
- Scheduling
- Single machine
Fingerprint
Dive into the research topics of 'Minimizing maximum late work with optional job rejection on a single machine'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver