Abstract
Phase I of the SARAF superconducting RF linac is under operation at the Soreq Nuclear Research Center. The present status of Phase I main components is reported, as well as, the beam operation experience accumulated in 2013-2014. The latter include acceleration of a 2 mA and 1.6 mA CW proton beams at energies of 2 MeV and 3.9 MeV correspondingly and 1 mA pulsed, duty cycle of few %, deuteron beams up to 5.6 MeV. The recent experiments include operation of intense CW proton beams on the liquid lithium target.
Original language | English |
---|---|
Article number | T10004 |
Journal | Journal of Instrumentation |
Volume | 10 |
Issue number | 10 |
DOIs | |
State | Published - 19 Oct 2015 |
Bibliographical note
Publisher Copyright:© 2015 IOP Publishing Ltd and Sissa Medialab srl.
Keywords
- Accelerator Applications
- Accelerator Subsystems and Technologies