Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection

Matan Atsmony, Gur Mosheiov*

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

1 Scopus citations

Abstract

We study a single machine due-date assignment problem with a common due-date. The objective function is minimizing the maximum earliness/tardiness cost. The scheduler may process only a subset of the jobs and the remaining jobs are rejected. Job-dependent rejection-costs are considered, and an upper bound on the total permitted rejection cost is assumed. The problem is proved to be NP-Hard. We present and test a pseudo-polynomial dynamic programming solution algorithm. An extension to the setting containing additional due-date cost component is also discussed. An efficient implementation of the algorithm is introduced, and medium size problems (containing hundreds of jobs) are shown to be solved in very reasonable running time. In addition, an intuitive heuristic is introduced, tested numerically, and is shown to produce very small optimality gaps.

Original languageEnglish
Pages (from-to)751-766
Number of pages16
JournalOptimization Letters
Volume18
Issue number3
DOIs
StatePublished - Apr 2024

Bibliographical note

Publisher Copyright:
© The Author(s), under exclusive licence to Springer-Verlag GmbH Germany, part of Springer Nature 2024.

Keywords

  • Due-date assignment
  • Dynamic programming
  • Earliness–tardiness
  • Job-rejection
  • Scheduling

Fingerprint

Dive into the research topics of 'Single machine scheduling to minimize maximum earliness/tardiness cost with job rejection'. Together they form a unique fingerprint.

Cite this