T1 - The parallel complexity of scheduling with precedence constraints
AU - Dolev, Danny
AU - Upfal, Eli
AU - Warmuth, Manfred K.
PY - 1986/12
Y1 - 1986/12
N2 - We study the problem of parallel computation of a schedule for a system of n unit-length tasks on m identical machines, when the tasks are related by a set of precedence constraints. We present NC algorithms for computing an optimal schedule in the case where m, the number of available machines, does not vary with time and the precedence constraints are represented by a collection of outtrees. The algorithms run on an exclusive read, exclusive write (EREW) PRAM. Their complexities are O(log n) and O((log n)2) parallel time using O(n2) and O(n) processors, respectively. The schedule computed by our algorithms is a height-priority schedule. As a complementary result we show that it is very unlikely that computing such a schedule is in NC when any of the above conditions is significantly relaxed. We prove that the problem is P-complete under logspace reductions when the precedence constraints are a collection of intrees and outtrees, or for a collection of outtrees when the number of available machines is allowed to increase with time. The time span of a height-priority schedule for an arbitrary precedence constraints graph is at most 2 - 1 (m - 1) times longer than the optimal (N. E Chen and C. L. Liu, Proc. 1974 Sagamore Computer Conference on Parallel Processing, T. Fend (Ed.), Springer-Verlag, Berlin, 1975, pp. 1-16). Whereas it is P-complete to produce the classical height-priority schedules even for very restricted precedence constraints graphs, we present a simple NC parallel algorithm which produces a different schedule that is only 2 - 1 m times the optimal.
AB - We study the problem of parallel computation of a schedule for a system of n unit-length tasks on m identical machines, when the tasks are related by a set of precedence constraints. We present NC algorithms for computing an optimal schedule in the case where m, the number of available machines, does not vary with time and the precedence constraints are represented by a collection of outtrees. The algorithms run on an exclusive read, exclusive write (EREW) PRAM. Their complexities are O(log n) and O((log n)2) parallel time using O(n2) and O(n) processors, respectively. The schedule computed by our algorithms is a height-priority schedule. As a complementary result we show that it is very unlikely that computing such a schedule is in NC when any of the above conditions is significantly relaxed. We prove that the problem is P-complete under logspace reductions when the precedence constraints are a collection of intrees and outtrees, or for a collection of outtrees when the number of available machines is allowed to increase with time. The time span of a height-priority schedule for an arbitrary precedence constraints graph is at most 2 - 1 (m - 1) times longer than the optimal (N. E Chen and C. L. Liu, Proc. 1974 Sagamore Computer Conference on Parallel Processing, T. Fend (Ed.), Springer-Verlag, Berlin, 1975, pp. 1-16). Whereas it is P-complete to produce the classical height-priority schedules even for very restricted precedence constraints graphs, we present a simple NC parallel algorithm which produces a different schedule that is only 2 - 1 m times the optimal.
UR - http://www.scopus.com/inward/record.url?scp=38249040298&partnerID=8YFLogxK
U2 - 10.1016/0743-7315(86)90014-6
DO - 10.1016/0743-7315(86)90014-6
M3 - ???researchoutput.researchoutputtypes.contributiontojournal.article???
AN - SCOPUS:38249040298
SN - 0743-7315
VL - 3
SP - 553
EP - 576
JO - Journal of Parallel and Distributed Computing
JF - Journal of Parallel and Distributed Computing
IS - 4
ER -