Upgrading of the AMS facility at the Koffler 14UD Pelletron accelerator

D. Berkovits, M. Paul*, Y. Ben-Dov, C. Bordeanu, S. Ghelberg, O. Heber, M. Hass, Y. Shahar, G. Verri

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

7 Scopus citations

Abstract

The AMS facility based on a 14UD Pelletron tandem accelerator has been upgraded in recent years to support an active and diversified research program. A new dedicated AMS ion source beam line merging at 45° with the existing injection line through a 45° electrostatic deflector is in operation. The multi-sample high-intensity Cs sputter ion source stands on a separate 120 kV platform and is remote-controlled through a hybrid infrared-fiber-optics link operated either manually or by the accelerator-control computer, ensuring safe and reliable operation. Independent current preamplifiers are used in Faraday cup current readings down to the pA range. The accelerator computer-control system was upgraded to LabView 6.1, allowing a PC server to control and read out all hardware components while one or more remote PC clients run the AMS software. Ad hoc sequences of commands, written in a script macro language, are run from a client computer to perform an automated AMS measurement. The present capabilities of the facility in terms of detected radionuclides and their sensitivities are listed.

Original languageEnglish
Pages (from-to)161-167
Number of pages7
JournalNuclear Instruments and Methods in Physics Research, Section B: Beam Interactions with Materials and Atoms
Volume223-224
Issue numberSPEC. ISS.
DOIs
StatePublished - Aug 2004

Keywords

  • Accelerator mass spectrometry
  • Cosmogenic radionuclides

Fingerprint

Dive into the research topics of 'Upgrading of the AMS facility at the Koffler 14UD Pelletron accelerator'. Together they form a unique fingerprint.

Cite this